Beacon Light Substation
Project Need
The Eagle area continues to experience significant growth. In order to site future facilities ahead of growth, Idaho Power has determined a new substation will be required west of Eagle in the next five to seven years.
To continue to provide reliable electric service and to meet both existing and future electrical capacity needs for the area, Idaho Power plans to construct a new substation on the southeast corner of Beacon Light and Linder roads. The project also will require a sub-transmission line along Linder Road. Construction is anticipated to begin in the spring of 2012.
Substation Details
Beacon Light Substation will serve the surrounding area north and west of Eagle. The substation will transform electricity from 138,000 volts (138 kV) to 12,470 volts (12.47 kV), and will be designed to ultimately serve up to eight 12.47-kV distribution circuits to bring electricity from the substation to homes and businesses in the area.
Typical proposed structure for Beacon Light Substation's source of power
Sub-Transmission Line Details
The sub-transmission line will be designed for two 138-kV sub-transmission circuits at the top and two 12.47-kV distribution circuits built underneath. The line will use steel poles and is proposed to run north from Idaho 44 and east to Linder Road. The existing distribution on the east side of Linder Road, will be incorporated on the sub-transmission line on the west side of Linder Road. A printable map is available. Road right of way or private easements would be used for the line corridor.
- Approximate length: 4.5 miles
- Structure type: Tubular steel poles
- Structure heights: 75 feet to 85 feet
- Structure spacing: 300 foot average
An example of how an Idaho Power substation appears in a rural setting.
Project Schedule
Site Selection
October 2002 – December 2002
Conditional Use Permit
March 2005 – August 2005
Construction
When load dictates need.
In Service
Estimated 2012
Project Schedule
138-kV Sub-transmission Line
Permitting
March 2005 – August 2005
Acquire Right-of-Way
August 2005 – December 2005
Construction
When load dictates need.
In Service
Estimated 2012
Contact Information
If you have questions about the Beacon Light Substation project or have information you wish to be considered, contact:
Keith Georgeson, Project Manager
Idaho Power
P O Box 70
Boise, ID 83707
Phone: 208-388-2034
e-mail: kgeorgeson@idahopower.com
Kristi Pardue, Facility Siting Coordinator
Idaho Power
P.O. Box 70
Boise, ID 83707
Phone: 208-388-2415
e-mail: kpardue@idahopower.com
Related Information
Treasure Valley Projects
Garden Valley Projects
Oregon Projects
Regional Projects
Generation Projects
Twin Falls Area Projects
Wood River Valley Projects
© 1995-2010 Idaho Power Company.